The prototype of your handheld sensor works. Now the battery door catches on the enclosure, the USB port sits slightly off center, and the quote for a production mold assumes the drawings are final. Which problem should a supplier solve first? In Chang’an, you can approach a prototype shop for a revised housing, a toolmaker for a mold review, or a manufacturer for the assembled device. Give each one a different brief.
Chang’an borders Shenzhen. Its town government identifies electronics and mechanical hardware and molds as local industries. Dongguan’s commerce bureau also documents a local trade fair covering machine tools, metalworking and molds. Those sources establish a reason to look here. A supplier still needs to show who will cut your particular tool, run the parts and inspect them. Town profile · Dongguan Bureau of Commerce
Choose the sample according to what you need to learn
For the sensor housing, mark the battery door, board mounting points and connector opening on a drawing. Ask for a machined or printed pair of shells and try them with the actual board and battery. Record where the parts touch and whether the user can operate the latch. If color or surface texture matters, keep the finish sample separate from the fit sample so the supplier knows which features each approval covers. One local example is LKprototype, which describes CNC machining, silicone vacuum casting and prototype work in Dongguan. Manufacturer’s process profile
Once the layout is stable, ask a toolmaker to mark the proposed parting line, gate and ejector locations on your drawing. A machined shell can fit perfectly even though the design still needs changes to release from a mold. Ask which visible faces might carry a witness mark and how a proposed change would affect the latch. For a bent metal bracket, send the mating component and specify the face that should remain free of tooling marks. Plastic molding design guide · Sheet metal bending guide
What changes between a sample and 500 saleable units?
A first run of 500–5,000 units is a buying scenario for this directory. No verified Chang’an-wide minimum order quantity was found. Agilian illustrates why the distinction matters. Its new-product development team describes paid engineering and sourcing with no minimum order quantity, subject to component availability. In a published pet-cleaning device project, the same manufacturer reports a production minimum of 1,000 pieces per color. Neither figure quotes your design. Development terms · Manufacturer’s project examples
Request separate prices for the engineering sample, tool construction, trial parts and accepted production units. Ask for comparable quotes at 500, 1,000 and 5,000 units using the same material, finish and inspection criteria. Specify whether the quantity is per color, per part or per assembled product. If the supplier needs to buy more resin or branded packaging than your build uses, agree who pays for the balance, who owns it and what happens if the next run changes color.
For the sensor, ask the supplier to send samples from the proposed production tool in the specified resin. Mark the drawing revision on the inspection record and keep one approved unit with each party. Agree which measurements will be checked during the run and what will happen if the first production pieces differ from the approved sample. A photograph of two closed shells tells you little about whether the latch will still work after repeated opening.
Decide what stays with the Shenzhen team
If your electrical engineer already works in Shenzhen, have that team settle connector selection, board revisions and firmware tests. Shenzhen’s Huaqiangbei ecosystem is documented as a center for electronic components and product development. Give the Chang’an shop the board outline, mounting positions and connector envelope needed for the housing. Send a physical board or a dimensionally accurate substitute for trial assembly. This division is a project choice. An integrated Dongguan manufacturer may also offer development and assembly. Shenzhen Government Online · Dongguan development and production example
Put one person in charge of releasing revisions. A port that moves after the toolmaker starts cutting can leave both teams working to drawings each believes are current. Ask the shop to acknowledge the revision in writing, flag any work already started, and price changes before proceeding.
Identify the company that will hold the mold
Ask for the Chinese name of the party quoting, the company that will make the tool and the site where it will be stored. If another company will mold or finish the parts, ask what files it needs and who can authorize their release. Give each party only the files needed for its work. A finishing shop can often quote from a drawing showing the relevant surfaces, material and finish without receiving the complete sensor assembly.
Before paying the tooling deposit, put the mold identifier, ownership, custodian, permitted use, maintenance and release arrangements in writing. Agree how trial failures will be corrected and who can authorize a tool transfer. Keep the quotation, drawing revision and photographs of the marked tool together. If the housing carries your brand, identify the trademark applicant before sending logo artwork to the molder or packaging supplier. Tooling and production agreement guide · European Commission China IP Helpdesk OEM case
Before sharing detailed drawings, sign a China NNN agreement with the relevant Chinese company and confirm mold ownership in written tooling terms. If the sensor or its packaging will carry your brand, review China trademark registration and decide which marks and goods to file for before releasing the artwork.
Directory information comes from public sources. Verify the company, production site and current terms before use. Inclusion does not constitute a recommendation, certification or guarantee.